Pages that link to "Item:Q742501"
From MaRDI portal
The following pages link to A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules (Q742501):
Displaying 17 items.
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals (Q319438) (← links)
- A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints (Q513546) (← links)
- A tabu search heuristic for the quay crane scheduling problem (Q835567) (← links)
- Simulation-based optimization for discharge/loading operations at a maritime container terminal (Q989637) (← links)
- A Benders decomposition-based framework for solving quay crane scheduling problems (Q1622801) (← links)
- Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level (Q1654372) (← links)
- A generalized classification scheme for crane scheduling with interference (Q1698922) (← links)
- The quay crane scheduling problem with non-crossing and safety clearance constraints: an exact solution approach (Q1738835) (← links)
- Generalized local branching heuristics and the capacitated ring tree problem (Q1744240) (← links)
- The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion (Q1753475) (← links)
- Modeling and solving rich quay crane scheduling problems (Q1761126) (← links)
- Modelling and metaheuristic for gantry crane scheduling and storage space allocation problem in railway container terminals (Q1784912) (← links)
- An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem (Q2255903) (← links)
- An algorithm based on makespan lower bound for quay crane schedule problem in container terminals (Q4986060) (← links)
- Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model (Q6187236) (← links)
- Scheduling double-track gantry cranes to minimize the overall loading/unloading time (Q6542999) (← links)
- Decomposition algorithms for the robust unidirectional quay crane scheduling problems (Q6568488) (← links)