Pages that link to "Item:Q744659"
From MaRDI portal
The following pages link to Integrated production and distribution scheduling with lifespan constraints (Q744659):
Displaying 19 items.
- Integrating deterioration and lifetime constraints in production and supply chain planning: a survey (Q296854) (← links)
- A robust optimization model for agile and build-to-order supply chain planning under uncertainties (Q512903) (← links)
- Integrated production and distribution scheduling with lifespan constraints (Q744659) (← links)
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines (Q1617275) (← links)
- Supply chain batching problem with identical orders and lifespan (Q1666418) (← links)
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence (Q1702665) (← links)
- Integrated production and distribution scheduling with a perishable product (Q1751906) (← links)
- A Benders decomposition-based heuristic for a production and outbound distribution scheduling problem with strict delivery constraints (Q1754044) (← links)
- Integrated scheduling of production and distribution with release dates and capacitated deliveries (Q1793780) (← links)
- A novel fuzzy mathematical model for an integrated supply chain planning using multi-objective evolutionary algorithm (Q2157018) (← links)
- Solving an integrated scheduling and routing problem with inventory, routing and penalty costs (Q2239995) (← links)
- Integrated Production Scheduling and Delivery Routing: Complexity Results and Column Generation (Q2835699) (← links)
- The integrated production and transportation scheduling problem for a product with a short lifespan (Q2900989) (← links)
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions (Q3100455) (← links)
- Integrated scheduling on parallel batch processing machines with non-identical capacities (Q5059346) (← links)
- A new heuristic scheduling method for the make-pack-route problem in make-to-order supply chains (Q5884367) (← links)
- Hyper-heuristic for integrated due-window scheduling and vehicle routing problem for perishable products considering production quality (Q6094436) (← links)
- A review on integrated scheduling and outbound vehicle routing problems (Q6168583) (← links)
- Home chemotherapy delivery: an integrated production scheduling and multi-trip vehicle routing problem (Q6572888) (← links)