Pages that link to "Item:Q747008"
From MaRDI portal
The following pages link to An MILP approach to multi-location, multi-period equipment selection for surface mining with case studies (Q747008):
Displaying 5 items.
- A new MIP model for mine equipment scheduling by minimizing maintenance cost (Q992721) (← links)
- A decomposition approach for an equipment selection and multiple product routing problem incorporating environmental factors (Q1877904) (← links)
- A NEW FUZZY MULTI CRITERIA DECISION MAKING MODEL FOR OPEN PIT MINES EQUIPMENT SELECTION (Q3013558) (← links)
- Concurrent open-pit mine production and in-pit crushing–conveying system planning (Q5059445) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)