Pages that link to "Item:Q821861"
From MaRDI portal
The following pages link to An exact solution method for multi-manned disassembly line design with and/or precedence relations (Q821861):
Displaying 7 items.
- Type-E disassembly line balancing problem with multi-manned workstations (Q779771) (← links)
- Constraint programming approaches to disassembly line balancing problem with sequencing decisions (Q2026975) (← links)
- Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches (Q2108816) (← links)
- A hybrid algorithm for the vehicle routing problem with and/or precedence constraints and time windows (Q2147032) (← links)
- A novel constraint programming and simulated annealing for disassembly line balancing problem with and/or precedence and sequence dependent setup times (Q2676318) (← links)
- An integrated approach for a new flexible multi-product disassembly line balancing problem (Q2676357) (← links)
- Constraint programming for multi-line parallel partial disassembly line balancing problem with optional common stations (Q6048922) (← links)