Pages that link to "Item:Q827287"
From MaRDI portal
The following pages link to Computing technical capacities in the European entry-exit gas market is NP-hard (Q827287):
Displaying 11 items.
- A system to evaluate gas network capacities: concepts and implementation (Q723970) (← links)
- The cost of decoupling trade and transport in the European entry-exit gas market with linear physics modeling (Q2060426) (← links)
- Deciding the feasibility of a booking in the European gas market is coNP-hard (Q2095927) (← links)
- Global optimization for the multilevel European gas market system with nonlinear flow models on trees (Q2114602) (← links)
- A bilevel optimization approach to decide the feasibility of bookings in the European gas market (Q2155380) (← links)
- Structural properties of feasible bookings in the European entry-exit gas market system (Q2190798) (← links)
- Bookings in the European gas market: characterisation of feasibility and computational complexity results (Q2303532) (← links)
- A multilevel model of the European entry-exit gas market (Q2417957) (← links)
- On the Complexity of Computing Maximum and Minimum Min‐Cost‐Flows (Q6065863) (← links)
- A survey on bilevel optimization under uncertainty (Q6096565) (← links)
- Coordination of power and natural gas markets via financial instruments (Q6166930) (← links)