Pages that link to "Item:Q827889"
From MaRDI portal
The following pages link to Programmed control of two-stage stochastic production systems (Q827889):
Displaying 7 items.
- On a model of joint control of reserves in automatic control systems of production (Q1778367) (← links)
- Optimal management of two-stage stochastic production systems (Q1792538) (← links)
- Combining solutions of the axial assignment problem (Q2052595) (← links)
- Production control in a two-stage system (Q2503061) (← links)
- Robust Process Control by Dynamic Stochastic Programming (Q2954560) (← links)
- Methods of non-deterministic linear programming -- further discussion in multihorizon system production control (Q3988866) (← links)
- Operations Research in Production Control—A Progress Report (Q5378669) (← links)