Pages that link to "Item:Q835555"
From MaRDI portal
The following pages link to A two-stage stochastic programming approach for project planning with uncertain activity durations (Q835555):
Displaying 19 items.
- Bi-objective multi-mode project scheduling under risk aversion (Q319785) (← links)
- An adaptive crashing policy for stochastic time-cost tradeoff problems (Q342024) (← links)
- A heuristic approach for resource constrained project scheduling with uncertain activity durations (Q632677) (← links)
- Predetermined intervals for start times of activities in the stochastic project scheduling problem (Q646669) (← links)
- Project bidding under deterministic and probabilistic activity durations (Q721677) (← links)
- Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty (Q747027) (← links)
- Lexicographic solution of two-objective project planning problem under constrained reliability index (Q895303) (← links)
- A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations (Q991368) (← links)
- Evaluating project completion time in project networks with discrete random activity durations (Q1017440) (← links)
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem (Q1654362) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- Project scheduling problem with stochastic activity duration times (Q2572685) (← links)
- Project planning with alternative technologies in uncertain environments (Q2630099) (← links)
- A compact reformulation of the two-stage robust resource-constrained project scheduling problem (Q2668660) (← links)
- Analysis of project scheduling strategies in a client-contractor environment (Q3809577) (← links)
- A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management (Q4427326) (← links)
- A CTMDP-Based Exact Method for RCPSP with Uncertain Activity Durations and Rework (Q4685811) (← links)
- Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology (Q5919228) (← links)
- \(\Gamma\)-robust optimization of project scheduling problems (Q6065662) (← links)