Pages that link to "Item:Q850309"
From MaRDI portal
The following pages link to Scheduling with flexible resources in parallel workcenters to minimize maximum completion time (Q850309):
Displaying 11 items.
- Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility (Q732893) (← links)
- Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs (Q858442) (← links)
- Minimizing the number of late jobs for the permutation flowshop problem with secondary resources (Q941545) (← links)
- Heuristics for parallel-machine flexible-resource scheduling problems with unspecified job assignment (Q1302577) (← links)
- An analysis of heuristics for the parallel-machine flexible-resource scheduling problem (Q1374455) (← links)
- Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems (Q1988965) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Exact and heuristic algorithms for the parallel machine total completion time scheduling problem with dual resources, ready times, and sequence-dependent setup times (Q2147050) (← links)
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods (Q2356015) (← links)
- Collaborative Operating Room Planning and Scheduling (Q4599323) (← links)
- (Q4996254) (← links)