Pages that link to "Item:Q858454"
From MaRDI portal
The following pages link to A scheduling policy for adjusting economic lot quantities to a feasible solution (Q858454):
Displaying 3 items.
- Economic lot scheduling problems incorporating a cost of using the production facility (Q3055413) (← links)
- Scheduling Economic Lot Size Production Runs (Q3197603) (← links)
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands (Q3778529) (← links)