Pages that link to "Item:Q868141"
From MaRDI portal
The following pages link to Flow shop scheduling problems with decreasing linear deterioration under dominant machines (Q868141):
Displaying 24 items.
- Scheduling of computational processes in real-time distributed systems with uncertain task execution times (Q395470) (← links)
- Parallel identical machines scheduling with deteriorating jobs and total absolute differences penalties (Q534918) (← links)
- Single machine quadratic penalty function scheduling with deteriorating jobs and group technology (Q611621) (← links)
- Single-machine scheduling with linear decreasing deterioration to minimize earliness penalties (Q638880) (← links)
- Makespan minimization in machine dominated flowshop (Q708144) (← links)
- Single machine group scheduling with time dependent processing times and ready times (Q726558) (← links)
- Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion time (Q861201) (← links)
- A note on single-machine scheduling with decreasing time-dependent job processing times (Q967802) (← links)
- The Browne-Yechiali single-machine sequence is optimal for flow-shops (Q976013) (← links)
- Flow shops with machine maintenance: ordered and proportionate cases (Q992582) (← links)
- Parallel machine earliness/tardiness scheduling problem under the effects of position based learning and linear/nonlinear deterioration (Q1010295) (← links)
- Scheduling jobs under decreasing linear deterioration (Q1041725) (← links)
- Flow-shops with a dominant machine (Q1203800) (← links)
- Scheduling problems with past-sequence-dependent setup times and general effects of deterioration and learning (Q1667775) (← links)
- A survey of scheduling problems with no-wait in process (Q1751258) (← links)
- Flow shop scheduling problems with deteriorating jobs on no-idle dominant machines (Q2370335) (← links)
- A note on flow shop scheduling problems with deteriorating jobs on no-idle dominant machines (Q2379563) (← links)
- Single machine group scheduling under decreasing linear deterioration (Q2454982) (← links)
- A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness (Q2456478) (← links)
- Minimizing makespan in permutation flow shop scheduling with proportional deterioration (Q2788531) (← links)
- Makespan minimization on three-machine flow shop with deteriorating jobs (Q2873830) (← links)
- (Q3023686) (← links)
- Flow shop scheduling problems with deteriorating jobs under dominating machines (Q5200791) (← links)
- Optimal four-machine flow shop scheduling with dominance condition (Q5454979) (← links)