Pages that link to "Item:Q906557"
From MaRDI portal
The following pages link to Robust execution strategies for project scheduling with unreliable resources and stochastic durations (Q906557):
Displaying 6 items.
- Time slack-based techniques for robust project scheduling subject to resource uncertainty (Q646671) (← links)
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities (Q835585) (← links)
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem (Q1723411) (← links)
- A survey of adjustable robust optimization (Q1740490) (← links)
- Robust local search for solving RCPSP/max with durational uncertainty (Q2887065) (← links)
- Minimizing the expected renewable resource costs in a project with stochastic resource availability (Q6561570) (← links)