Pages that link to "Item:Q919989"
From MaRDI portal
The following pages link to Coordinated production scheduling for make-to-order manufacturing (Q919989):
Displaying 16 items.
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints (Q417989) (← links)
- A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing (Q872122) (← links)
- Production strategies for a stochastic lot-sizing problem with constant capacity (Q1268260) (← links)
- Price-based planning and scheduling of multiproduct orders in symbiotic manufacturing networks (Q1278475) (← links)
- Material compatibility constraints for make-to-order production planning. (Q1412704) (← links)
- Heuristic procedures for a stochastic lot-sizing problem in make-to-order manufacturing (Q1904681) (← links)
- Integer programming approach to production scheduling for make-to-order manufacturing (Q2486790) (← links)
- Plan optimisation algorithm given with line chart (Q2768230) (← links)
- Synchronized development of production, inventory, and distribution schedules (Q2783864) (← links)
- Operator allocation planning for reconfigurable production line in one-of-a-kind production (Q2997882) (← links)
- Coordinated scheduling of customer orders for quick response (Q3367031) (← links)
- Multi-objective master production scheduling in make-to-order manufacturing (Q3605399) (← links)
- Order selection optimization in hybrid make-to-order and make-to-stock markets (Q4658500) (← links)
- A multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturing (Q5438563) (← links)
- Hierarchical approach to production scheduling in make-to-order assembly (Q5478833) (← links)
- An improved decision support model for scheduling production in an engineer-to-order manufacturer (Q6097850) (← links)