Pages that link to "Item:Q945229"
From MaRDI portal
The following pages link to Ant colony optimization for the job rotation scheduling problem (Q945229):
Displaying 4 items.
- Ant colony optimization for power plant maintenance scheduling optimization -- a five-station hydropower system (Q940909) (← links)
- A simulated annealing approach to the solution of job rotation scheduling problems (Q2371395) (← links)
- Reducing ergonomic risks by job rotation scheduling (Q2393126) (← links)
- A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem (Q5246811) (← links)