Pages that link to "Item:Q945351"
From MaRDI portal
The following pages link to A multi-objective resource allocation problem in dynamic PERT networks (Q945351):
Displaying 12 items.
- Resource allocation in multi-class dynamic PERT networks with finite capacity (Q320114) (← links)
- Resource allocation in dynamic PERT networks with finite capacity (Q420887) (← links)
- Solution of interval PERT/CPM network problems by a simplified tabular method (Q505096) (← links)
- Bicriteria shortest path in networks of queues (Q861124) (← links)
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach (Q872140) (← links)
- Computing project makespan distributions: Markovian PERT networks revisited (Q1634063) (← links)
- Resource tardiness weighted cost minimization in project scheduling (Q1748510) (← links)
- Time-cost trade-off via optimal control theory in Markov PERT networks (Q2480200) (← links)
- A multi-objective resource allocation problem in PERT networks (Q2488911) (← links)
- A genetic algorithm approach for the time-cost trade-off in PERT networks (Q2572768) (← links)
- On-line control model for network construction projects (Q4367030) (← links)
- (Q5202824) (← links)