Pages that link to "Item:Q945935"
From MaRDI portal
The following pages link to Genetic algorithm-based multi-objective model for scheduling of linear construction projects (Q945935):
Displaying 4 items.
- A GA optimization model for workgroup-based repetitive scheduling (WoRSM) (Q1005604) (← links)
- A biobjective optimization model for deadline satisfaction in line-of-balance scheduling with work interruptions consideration (Q1721280) (← links)
- A nonlinear multiobjective bilevel model for minimum cost network flow problem in a large-scale construction project (Q1954798) (← links)
- Application of GA optimization for solving precedent relationship problem in project scheduling (Q2450431) (← links)