Pages that link to "Item:Q964867"
From MaRDI portal
The following pages link to Production setup-sequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patching (Q964867):
Displaying 11 items.
- A genetic algorithm/mathematical programming approach to solve a two-level soft drink production problem (Q337043) (← links)
- Mathematical programming-based approaches for multi-facility Glass container production planning (Q342464) (← links)
- Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration (Q983631) (← links)
- Solution approaches for the soft drink integrated production lot sizing and scheduling problem (Q1027560) (← links)
- The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model (Q1664892) (← links)
- Classifying and modeling setups and cleanings in lot sizing and scheduling (Q1753633) (← links)
- Alternative mathematical models and solution approaches for lot-sizing and scheduling problems in the brewery industry: analyzing two different situations (Q1993026) (← links)
- Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: robust formulation and a decomposition solution approach (Q2158042) (← links)
- Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup (Q2239950) (← links)
- Simultaneous lotsizing and scheduling problems: a classification and review of models (Q2362236) (← links)
- A sustainable inventory model to study the mixing and bottling plant of single item for cost minimization (Q6063789) (← links)