Pages that link to "Item:Q964869"
From MaRDI portal
The following pages link to Group-scheduling problems in electronics manufacturing (Q964869):
Displaying 7 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- A single machine carryover sequence-dependent group scheduling in PCB manufacturing (Q339574) (← links)
- Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process (Q1278196) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- An enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes (Q1652033) (← links)
- An efficient model-based branch-and-price algorithm for unrelated-parallel machine batching and scheduling problems (Q2093186) (← links)
- Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem (Q2341222) (← links)