Pages that link to "Item:Q973058"
From MaRDI portal
The following pages link to Level scheduling for batched JIT supply (Q973058):
Displaying 7 items.
- Level scheduling under limited resequencing flexibility (Q539476) (← links)
- Solving symmetric mixed-model multi-level just-in-time scheduling problems (Q968134) (← links)
- Scheduling just-in-time part supply for mixed-model assembly lines (Q2275595) (← links)
- Stochastic mixed-model assembly line sequencing problem: mathematical modeling and Q-learning based simulated annealing hyper-heuristics (Q2282543) (← links)
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems (Q3818790) (← links)
- Analysis of batched service time data using Gaussian and semi-parametric kernel models (Q5036997) (← links)
- Mixed-model moving assembly line material placement optimization for a shorter time-dependent worker walking time (Q6577341) (← links)