Pages that link to "Item:Q992582"
From MaRDI portal
The following pages link to Flow shops with machine maintenance: ordered and proportionate cases (Q992582):
Displaying 8 items.
- Two-machine flow shop and open shop scheduling problems with a single maintenance window (Q724106) (← links)
- Single machine scheduling with multiple common due date assignment and aging effect under a deteriorating maintenance activity consideration (Q741381) (← links)
- Single machine flow-time scheduling with scheduled maintenance (Q811593) (← links)
- Flow-shops with a dominant machine (Q1203800) (← links)
- Online scheduling of ordered flow shops (Q1991105) (← links)
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem (Q2664314) (← links)
- Planning Machine Maintenance in Two-Machine Shop Scheduling (Q3392021) (← links)
- Incorporating preventive maintenance into the <i>m</i>-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study (Q5058979) (← links)