Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Optimal pricing and production master planning in a multiperiod horizon considering capacity and inventory constraints - MaRDI portal

Optimal pricing and production master planning in a multiperiod horizon considering capacity and inventory constraints (Q1036498)

From MaRDI portal





scientific article; zbMATH DE number 5632564
Language Label Description Also known as
English
Optimal pricing and production master planning in a multiperiod horizon considering capacity and inventory constraints
scientific article; zbMATH DE number 5632564

    Statements

    Optimal pricing and production master planning in a multiperiod horizon considering capacity and inventory constraints (English)
    0 references
    13 November 2009
    0 references
    Summary: We formulate and solve a single-item joint pricing and master planning optimization problem with capacity and inventory constraints. The objective is to maximize profits over a discrete-time multiperiod horizon. The solution process consists of two steps. First, we solve the single-period problem exactly. Second, using the exact solution of the single-period problem, we solve the multiperiod problem using a dynamic programming approach. The solution process and the importance of considering both capacity and inventory constraints are illustrated with numerical examples.
    0 references

    Identifiers