An extension of the extended basic period approach for economic lot scheduling problems (Q1072929)

From MaRDI portal





scientific article; zbMATH DE number 3943535
Language Label Description Also known as
English
An extension of the extended basic period approach for economic lot scheduling problems
scientific article; zbMATH DE number 3943535

    Statements

    An extension of the extended basic period approach for economic lot scheduling problems (English)
    0 references
    1987
    0 references
    This paper addresses the problem of choosing cyclical production patterns for several products which are produced on a common production facility. The extended basic period approach of \textit{S. E. Elmaghraby} [Manage. Sci. 24, 587-598 (1978; Zbl 0376.90051)] is extended by allowing more than two basic periods. The problem of dimensionality of the dynamic programming formulation is dealt with by aggregating the capacity data in different basic periods.
    0 references
    cyclical production patterns
    0 references
    extended basic period approach
    0 references
    economic lot scheduling
    0 references
    aggregation
    0 references
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references