Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Scheduling tree-structured tasks with restricted execution times - MaRDI portal

Scheduling tree-structured tasks with restricted execution times (Q1111371)

From MaRDI portal





scientific article; zbMATH DE number 4076608
Language Label Description Also known as
English
Scheduling tree-structured tasks with restricted execution times
scientific article; zbMATH DE number 4076608

    Statements

    Scheduling tree-structured tasks with restricted execution times (English)
    0 references
    0 references
    0 references
    1988
    0 references
    We show that scheduling a tree-structured task system with two execution times in order to minimize the schedule length is strongly NP-hard for an arbitrary number of processors. If the execution times are powers of some integer \(r>1\), then the problem is NP-hard even for two processors.
    0 references
    NP-completeness
    0 references
    NP-hardness
    0 references
    multiprocessor scheduling
    0 references
    tree-structured task system
    0 references
    schedule length
    0 references

    Identifiers