Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Preemptive scheduling of independent jobs on a hypercube - MaRDI portal

Preemptive scheduling of independent jobs on a hypercube (Q1111373)

From MaRDI portal





scientific article; zbMATH DE number 4076609
Language Label Description Also known as
English
Preemptive scheduling of independent jobs on a hypercube
scientific article; zbMATH DE number 4076609

    Statements

    Preemptive scheduling of independent jobs on a hypercube (English)
    0 references
    0 references
    0 references
    1988
    0 references
    We consider the problem of scheduling n independent jobs on an m- dimensional hypercube system to minimize the finishing time, where each job \(J_ i\) is associated with a dimension \(d_ i\) and a processing time \(t_ i\), meaning that \(J_ i\) requires a \(d_ i\)-dimensional subcube for \(t_ i\) units of time. An \(O(n^ 2)\) algorithm is presented that decides if all n jobs can be finished by a given deadline T. Using this algorithm, one may obtain a minimum-finishing-time schedule in polynomial time.
    0 references
    preemptive scheduling
    0 references
    hypercube
    0 references
    0 references

    Identifiers