Some observations and extensions of the optimal TWK-power due-date determination and sequencing problem (Q1117832)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Some observations and extensions of the optimal TWK-power due-date determination and sequencing problem |
scientific article; zbMATH DE number 4093161
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Some observations and extensions of the optimal TWK-power due-date determination and sequencing problem |
scientific article; zbMATH DE number 4093161 |
Statements
Some observations and extensions of the optimal TWK-power due-date determination and sequencing problem (English)
0 references
1989
0 references
This paper considers the same problem as studied previously by the first author [Int. J. Syst. Sci. 18, 1-7 (1987; Zbl 0615.90067)] which is concerned with the optimal determination of TWK-power due-dates and sequencing of n jobs on a single machine. A detailed analysis of the cost function used in Cheng's model is presented from which we note that under suitable assumptions a very simple way to find the optimal solution is available. An extension of the original due-date sequencing optimization problem is discussed and the necessary and sufficient optimality conditions for the extended problem are derived.
0 references
TWK-power due-dates
0 references
sequencing
0 references
single machine
0 references
necessary and sufficient optimality conditions
0 references