Selection of optimal site for new depot of specified capacity with two objectives (Q1118521)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Selection of optimal site for new depot of specified capacity with two objectives |
scientific article; zbMATH DE number 4095175
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Selection of optimal site for new depot of specified capacity with two objectives |
scientific article; zbMATH DE number 4095175 |
Statements
Selection of optimal site for new depot of specified capacity with two objectives (English)
0 references
1989
0 references
The problem of selecting an optimal site for an new depot of specified capacity from several potential sites along with determining an optimal schedule to take buses from depots to the starting points of their routes and also determining the spare capacity available at each of the depots after the construction of a new depot is considered. Capacities of the respective depots and the number of buses required at the starting points of the respective routes are specified. The problem has two objectives - one primary and another secondary. The primary objective is to minimize the capital expenditure to be incurred in constructing a new depot plus the present value of the expenditure to be incurred in total dead mileage over a planning horizon. The secondary objective is to minimize the maximum of the dead mileage of individual buses. An algorithm is developed to obtain the solution of this two-objective location problem.
0 references
bus depot location
0 references
optimal site
0 references
two-objective location
0 references