On two-machine scheduling with release and due dates to minimize maximum lateness (Q1149374)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: On two-machine scheduling with release and due dates to minimize maximum lateness |
scientific article; zbMATH DE number 3709911
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | On two-machine scheduling with release and due dates to minimize maximum lateness |
scientific article; zbMATH DE number 3709911 |
Statements
On two-machine scheduling with release and due dates to minimize maximum lateness (English)
0 references
1980
0 references
two-machine scheduling
0 references
due dates
0 references
branch-and-bound algorithm
0 references
sequencing n jobs
0 references
critical path concept
0 references
computational experience
0 references
minimization of maximum lateness
0 references
release dates
0 references