Realization of an algorithm for constructing an optimal schedule with a start point in a given interval (Q1165773)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Realization of an algorithm for constructing an optimal schedule with a start point in a given interval |
scientific article; zbMATH DE number 3767434
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Realization of an algorithm for constructing an optimal schedule with a start point in a given interval |
scientific article; zbMATH DE number 3767434 |
Statements
Realization of an algorithm for constructing an optimal schedule with a start point in a given interval (English)
0 references
1982
0 references
preemptive scheduling
0 references
single-machine scheduling
0 references
minimal joint cost
0 references