The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine (Q1302720)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine |
scientific article; zbMATH DE number 1341326
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine |
scientific article; zbMATH DE number 1341326 |
Statements
The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine (English)
0 references
22 September 1999
0 references
schedule
0 references
two-stage flowshop
0 references
NP-hardness
0 references