Acceptance sampling by variables when the remainder of rejected lots is inspected (Q1342774)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Acceptance sampling by variables when the remainder of rejected lots is inspected |
scientific article; zbMATH DE number 711357
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Acceptance sampling by variables when the remainder of rejected lots is inspected |
scientific article; zbMATH DE number 711357 |
Statements
Acceptance sampling by variables when the remainder of rejected lots is inspected (English)
0 references
1 March 1995
0 references
tables
0 references
sample size
0 references
critical value
0 references
inspection by variables
0 references
mean inspection cost per lot of process average quality
0 references
Dodge-Romig LTPD attribute sampling plans
0 references
tolerance fraction defective
0 references
0.9093419
0 references
0.86752087
0 references
0.86752087
0 references
0.86559445
0 references
0.85381114
0 references