Time scale decomposition in production planning for unreliable flexible manufacturing systems (Q1388899)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Time scale decomposition in production planning for unreliable flexible manufacturing systems |
scientific article; zbMATH DE number 1162896
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Time scale decomposition in production planning for unreliable flexible manufacturing systems |
scientific article; zbMATH DE number 1162896 |
Statements
Time scale decomposition in production planning for unreliable flexible manufacturing systems (English)
0 references
11 June 1998
0 references
stochastic control
0 references
unreliable flexible manufacturing systems
0 references
hedging point policies
0 references
switching diffusion models
0 references
two-time scale structure
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references