Case study on statistically estimating minimum makespan for flow line scheduling problems. (Q1427564)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Case study on statistically estimating minimum makespan for flow line scheduling problems. |
scientific article; zbMATH DE number 2055804
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Case study on statistically estimating minimum makespan for flow line scheduling problems. |
scientific article; zbMATH DE number 2055804 |
Statements
Case study on statistically estimating minimum makespan for flow line scheduling problems. (English)
0 references
14 March 2004
0 references
Heuristics
0 references
Scheduling
0 references
Confidence-interval estimation
0 references
Flexible flow line
0 references
0 references
0 references
0 references
0 references