A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints (Q1572969)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints |
scientific article; zbMATH DE number 1484893
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints |
scientific article; zbMATH DE number 1484893 |
Statements
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints (English)
0 references
6 August 2000
0 references
integer programming
0 references
optimisation
0 references
scheduling
0 references
assembly system
0 references
0 references
0 references
0.9003166
0 references
0.8908318
0 references
0.87303495
0 references
0.87014055
0 references
0.8698392
0 references
0.86907107
0 references
0.86796725
0 references
0.8677174
0 references
0.8662428
0 references