An extended study on an open-shop scheduling problem using the minimisation of the sum of quadratic completion times (Q1644059)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: An extended study on an open-shop scheduling problem using the minimisation of the sum of quadratic completion times |
scientific article; zbMATH DE number 6892444
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | An extended study on an open-shop scheduling problem using the minimisation of the sum of quadratic completion times |
scientific article; zbMATH DE number 6892444 |
Statements
An extended study on an open-shop scheduling problem using the minimisation of the sum of quadratic completion times (English)
0 references
21 June 2018
0 references
scheduling
0 references
open shop
0 references
quadratic completion time
0 references
Lagrangian relaxation
0 references
dynamic programming
0 references
optimal property
0 references
0 references
0 references
0 references