Solving integrated process planning and scheduling problem with constructive meta-heuristics (Q1671703)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Solving integrated process planning and scheduling problem with constructive meta-heuristics |
scientific article; zbMATH DE number 6933780
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Solving integrated process planning and scheduling problem with constructive meta-heuristics |
scientific article; zbMATH DE number 6933780 |
Statements
Solving integrated process planning and scheduling problem with constructive meta-heuristics (English)
0 references
7 September 2018
0 references
jobshop scheduling
0 references
process planning
0 references
constructive meta-heuristics
0 references
ant colony optimization
0 references
0 references
0 references
0 references
0 references
0 references
0 references