Long-term integrated surgery room optimization and recovery ward planning, with a case study in the Brazilian national institute of traumatology and orthopedics (INTO) (Q1681402)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Long-term integrated surgery room optimization and recovery ward planning, with a case study in the Brazilian national institute of traumatology and orthopedics (INTO) |
scientific article; zbMATH DE number 6811966
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Long-term integrated surgery room optimization and recovery ward planning, with a case study in the Brazilian national institute of traumatology and orthopedics (INTO) |
scientific article; zbMATH DE number 6811966 |
Statements
Long-term integrated surgery room optimization and recovery ward planning, with a case study in the Brazilian national institute of traumatology and orthopedics (INTO) (English)
0 references
23 November 2017
0 references
healthcare modeling
0 references
mathematical programing
0 references
queuing theory
0 references
scheduling
0 references
0 references
0 references
0.8073667
0 references
0.78863096
0 references
0.7859788
0 references
0.7845723
0 references
0.77636695
0 references
0.77449566
0 references
0.77356267
0 references