Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Estimation of costs and durations of construction of urban roads using ANN and SVM - MaRDI portal

Deprecated: Use of MediaWiki\Skin\SkinTemplate::injectLegacyMenusIntoPersonalTools was deprecated in Please make sure Skin option menus contains `user-menu` (and possibly `notifications`, `user-interface-preferences`, `user-page`) 1.46. [Called from MediaWiki\Skin\SkinTemplate::getPortletsTemplateData in /var/www/html/w/includes/Skin/SkinTemplate.php at line 691] in /var/www/html/w/includes/Debug/MWDebug.php on line 372

Deprecated: Use of MediaWiki\Skin\BaseTemplate::getPersonalTools was deprecated in 1.46 Call $this->getSkin()->getPersonalToolsForMakeListItem instead (T422975). [Called from Skins\Chameleon\Components\NavbarHorizontal\PersonalTools::getHtml in /var/www/html/w/skins/chameleon/src/Components/NavbarHorizontal/PersonalTools.php at line 66] in /var/www/html/w/includes/Debug/MWDebug.php on line 372

Deprecated: Use of QuickTemplate::(get/html/text/haveData) with parameter `personal_urls` was deprecated in MediaWiki Use content_navigation instead. [Called from MediaWiki\Skin\QuickTemplate::get in /var/www/html/w/includes/Skin/QuickTemplate.php at line 131] in /var/www/html/w/includes/Debug/MWDebug.php on line 372

Estimation of costs and durations of construction of urban roads using ANN and SVM (Q1694185)

From MaRDI portal





scientific article; zbMATH DE number 6833371
Language Label Description Also known as
English
Estimation of costs and durations of construction of urban roads using ANN and SVM
scientific article; zbMATH DE number 6833371

    Statements

    Estimation of costs and durations of construction of urban roads using ANN and SVM (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    1 February 2018
    0 references
    Summary: Offer preparation has always been a specific part of a building process which has significant impact on company business. Due to the fact that income greatly depends on offer's precision and the balance between planned costs, both direct and overheads, and wished profit, it is necessary to prepare a precise offer within required time and available resources which are always insufficient. The paper presents a research of precision that can be achieved while using artificial intelligence for estimation of cost and duration in construction projects. Both artificial neural networks (ANNs) and support vector machines (SVM) are analyzed and compared. The best SVM has shown higher precision, when estimating costs, with mean absolute percentage error (MAPE) of 7.06\% compared to the most precise ANNs which has achieved precision of 25.38\%. Estimation of works duration has proved to be more difficult. The best MAPEs were 22.77\% and 26.26\% for SVM and ANN, respectively.
    0 references
    construction of urban roads
    0 references
    precise offer
    0 references
    estimation of costs and duration
    0 references
    artificial neural networks (ANNs)
    0 references
    support vector machines (SVM)
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references