Balancing a robotic spot welding manufacturing line: an industrial case study (Q1694852)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Balancing a robotic spot welding manufacturing line: an industrial case study |
scientific article; zbMATH DE number 6835094
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Balancing a robotic spot welding manufacturing line: an industrial case study |
scientific article; zbMATH DE number 6835094 |
Statements
Balancing a robotic spot welding manufacturing line: an industrial case study (English)
0 references
6 February 2018
0 references
combinatorial optimization
0 references
assembly line balancing problem
0 references
robotic welding manufacturing line
0 references
mixed integer linear programming
0 references
0 references
0 references
0.8174875
0 references
0.8041085
0 references
0.7970735
0 references
0.79613936
0 references