Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Research for global coordinating method of large equipment scheduling in construction site - MaRDI portal

Research for global coordinating method of large equipment scheduling in construction site (Q1723178)

From MaRDI portal





scientific article; zbMATH DE number 7025222
Language Label Description Also known as
English
Research for global coordinating method of large equipment scheduling in construction site
scientific article; zbMATH DE number 7025222

    Statements

    Research for global coordinating method of large equipment scheduling in construction site (English)
    0 references
    0 references
    0 references
    0 references
    19 February 2019
    0 references
    Summary: Much energy is dissipated when large equipment moves slowly. Generally, equipment scheduling at construction site is supposed to minimize equipment slowdown and deadhead moving. Table methods are always adopted to optimize transfer sequence, but the feasible solution is well disappointing. For the acceptable solution relevant to task points in construction equipment scheduling, transfer table is divided into four regions. After proper augmentation and deflation, the acceptable solution evolves into global coordinating solution of construction scheduling, which contributes to minimizing slowdown and deadhead mileages. This method has been verified in practical engineering and is a significant reference on decision making of construction equipment scheduling.