Research for global coordinating method of large equipment scheduling in construction site (Q1723178)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Research for global coordinating method of large equipment scheduling in construction site |
scientific article; zbMATH DE number 7025222
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Research for global coordinating method of large equipment scheduling in construction site |
scientific article; zbMATH DE number 7025222 |
Statements
Research for global coordinating method of large equipment scheduling in construction site (English)
0 references
19 February 2019
0 references
Summary: Much energy is dissipated when large equipment moves slowly. Generally, equipment scheduling at construction site is supposed to minimize equipment slowdown and deadhead moving. Table methods are always adopted to optimize transfer sequence, but the feasible solution is well disappointing. For the acceptable solution relevant to task points in construction equipment scheduling, transfer table is divided into four regions. After proper augmentation and deflation, the acceptable solution evolves into global coordinating solution of construction scheduling, which contributes to minimizing slowdown and deadhead mileages. This method has been verified in practical engineering and is a significant reference on decision making of construction equipment scheduling.
0 references
0.76328653
0 references
0.7611581
0 references
0.7595898
0 references