A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles (Q1754041)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles |
scientific article; zbMATH DE number 6876520
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles |
scientific article; zbMATH DE number 6876520 |
Statements
A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles (English)
0 references
30 May 2018
0 references
project scheduling
0 references
flexible resource profiles
0 references
schedule generation scheme
0 references
metaheuristics
0 references
0 references
0 references