Project crashing in the presence of general non-linear activity time reduction costs (Q1758859)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Project crashing in the presence of general non-linear activity time reduction costs |
scientific article; zbMATH DE number 6108293
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Project crashing in the presence of general non-linear activity time reduction costs |
scientific article; zbMATH DE number 6108293 |
Statements
Project crashing in the presence of general non-linear activity time reduction costs (English)
0 references
16 November 2012
0 references
Summary: We are concerned with the project crashing problem. The functional form we consider for the crashing costs is a negative-exponential form of the amount of capital invested that captures most of the more realistic forms that have been proposed in the literature. We formulate a non-linear optimisation model of the resulting generalised crashing problem, and develop a convex geometric programming approximation of this model. The model can be readily extended to handle situations where it is desired to determine the minimum capital investment needed to crash activities so that the total project duration does not exceed a given time length. Numerical illustrations of the approach are provided.
0 references
project management
0 references
activity crashing
0 references
project time-cost analysis
0 references
geometric programming
0 references