A note on two-agent scheduling on an unbounded parallel-batching machine with makespan and maximum lateness objectives (Q1788999)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A note on two-agent scheduling on an unbounded parallel-batching machine with makespan and maximum lateness objectives |
scientific article; zbMATH DE number 6949418
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A note on two-agent scheduling on an unbounded parallel-batching machine with makespan and maximum lateness objectives |
scientific article; zbMATH DE number 6949418 |
Statements
A note on two-agent scheduling on an unbounded parallel-batching machine with makespan and maximum lateness objectives (English)
0 references
9 October 2018
0 references
two-agent scheduling
0 references
parallel-batching
0 references
maximum lateness
0 references
Pareto optimal points
0 references
0 references
0 references
0.9721871
0 references
0.9361108
0 references
0.9334305
0 references
0.9294026
0 references
0.92519057
0 references
0.9234381
0 references
0.9205437
0 references
0.9202162
0 references