Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Open shop scheduling with makespan and total completion time criteria - MaRDI portal

Open shop scheduling with makespan and total completion time criteria (Q1818565)

From MaRDI portal





scientific article; zbMATH DE number 1384035
Language Label Description Also known as
English
Open shop scheduling with makespan and total completion time criteria
scientific article; zbMATH DE number 1384035

    Statements

    Open shop scheduling with makespan and total completion time criteria (English)
    0 references
    15 February 2000
    0 references
    In this paper we study the two machine open shop scheduling problem with a hierarchical objective: minimize the total completion time subject to minimum makespan. We show that this problem is distinct from the closely related problem of minimizing the total completion time. We develop polynomial-time algorithms for three special cases and an asymptotically optimal polynomial-time heuristic when a machine is dominant. We also extend some of our results to the three machine open shop case.
    0 references
    open shop scheduling
    0 references
    heuristics
    0 references
    worst-case performance
    0 references