Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Planning lot sizes and capacity requirements in a single stage production system - MaRDI portal

Planning lot sizes and capacity requirements in a single stage production system (Q1821021)

From MaRDI portal





scientific article; zbMATH DE number 3997535
Language Label Description Also known as
English
Planning lot sizes and capacity requirements in a single stage production system
scientific article; zbMATH DE number 3997535

    Statements

    Planning lot sizes and capacity requirements in a single stage production system (English)
    0 references
    1987
    0 references
    The problem addressed in this paper is the determination of lot sizes for multiple products to be produced on a single production facility with limited capacity. Demand is assumed to be deterministic and time-varying and must be met without backordering. The objective is to minimize the sum of setup and inventory holding costs. A heuristic solution procedure of the period-by-period type is presented. Moreover, the interaction between lot sizing and smoothing of capacity requirements is investigated in a case study.
    0 references
    planning
    0 references
    scheduling
    0 references
    lot sizes
    0 references
    multiple products
    0 references
    single production facility
    0 references
    limited capacity
    0 references
    0 references

    Identifiers