Two-stage proportionate flexible flow shop to minimize the makespan (Q1945694)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two-stage proportionate flexible flow shop to minimize the makespan |
scientific article; zbMATH DE number 6151671
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Two-stage proportionate flexible flow shop to minimize the makespan |
scientific article; zbMATH DE number 6151671 |
Statements
Two-stage proportionate flexible flow shop to minimize the makespan (English)
0 references
8 April 2013
0 references
scheduling
0 references
proportionate flexible flow shop
0 references
computational complexity
0 references
approximation algorithm
0 references
0 references
0.8852793
0 references
0.86032295
0 references
0.84827816
0 references
0.84735453
0 references
0.8455691
0 references
0.8448564
0 references
0.84422755
0 references