A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure (Q1983744)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure |
scientific article; zbMATH DE number 7394173
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure |
scientific article; zbMATH DE number 7394173 |
Statements
A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure (English)
0 references
10 September 2021
0 references
flowshop
0 references
scheduling-no-wait-two-machine-maxium
0 references
lateness-uncertain setup times
0 references
0 references
0 references
0 references
0 references
0 references
0 references