A case study on effect of grouping technique in a multi-stage hybrid flow shop (Q2224063)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A case study on effect of grouping technique in a multi-stage hybrid flow shop |
scientific article
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A case study on effect of grouping technique in a multi-stage hybrid flow shop |
scientific article |
Statements
A case study on effect of grouping technique in a multi-stage hybrid flow shop (English)
0 references
3 February 2021
0 references
Summary: In general, the hybrid flow shop problem (HFSP) is complex in nature. This papers deals with the effect of grouping technique in a multi-stage HFSP with practical relevance. With respect to increase in stages of HSFP, the level of complexity in solving the problem is increased. This paper deals with the problem which is motivated by practical need for operational scheduling in automobile spares manufacturing industry. The venture of this attempt is throughput related, i.e., minimising makespan. The simulation algorithms were used to find answers of many `what if?' questions. The parameters included in this problem are queue length, mean lead time, machine utilisation to optimise the manufacturing strategy. In this problem, queue discipline was considered by applying first-in-first-out (FIFO) at all stages. The proposed group schedule yielded minimum makespan, acceptable queue length and significantly improved machine utilisation in the real-time examination.
0 references
hybrid flow shops
0 references
HFS
0 references
simulation
0 references
makespan
0 references
group scheduling
0 references
critical machine
0 references
mathematical modelling
0 references
flow shop scheduling
0 references
case study
0 references
grouping
0 references
multi-stage flow shops
0 references
automobile industry
0 references
automotive spares manufacturing
0 references
queue length
0 references
lead times
0 references
machine utilisation
0 references
manufacturing strategy
0 references