Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
An EPQ model for delayed deteriorating items with reliability consideration and quadratic demand - MaRDI portal

An EPQ model for delayed deteriorating items with reliability consideration and quadratic demand (Q2247424)

From MaRDI portal
scientific article
Language Label Description Also known as
English
An EPQ model for delayed deteriorating items with reliability consideration and quadratic demand
scientific article

    Statements

    An EPQ model for delayed deteriorating items with reliability consideration and quadratic demand (English)
    0 references
    0 references
    0 references
    17 November 2021
    0 references
    Summary: In this paper, an EPQ model for delayed deteriorating items is developed where the demand before deterioration sets in is assumed to be different from that after deterioration sets in. There are three stages for the inventory system as follows: (1) the production build-up stage \((0 \leq t \leq L_1)\); (2) stage before deterioration sets in \((L_1 \leq t \leq L_2)\); (3) stage after deterioration sets in \((L_3 \leq t \leq L)\). It is also assumed that the unit cost of production is directly proportional to the process reliability and inversely proportional to the rate of demand and shortages are not allowed. A numerical example is given to illustrate the developed model and sensitivity analysis carried out on the example to see the effect of parameter changes.
    0 references
    economic production quantity
    0 references
    EPQ
    0 references
    quadratic demand
    0 references
    reliability
    0 references
    delayed deterioration
    0 references

    Identifiers