Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Heuristic approach for \(N\)-job, 3-machine flow shop scheduling problem involving transportation time, break down time and weights of jobs - MaRDI portal

Heuristic approach for \(N\)-job, 3-machine flow shop scheduling problem involving transportation time, break down time and weights of jobs (Q2574384)

From MaRDI portal
scientific article
Language Label Description Also known as
English
Heuristic approach for \(N\)-job, 3-machine flow shop scheduling problem involving transportation time, break down time and weights of jobs
scientific article

    Statements

    Heuristic approach for \(N\)-job, 3-machine flow shop scheduling problem involving transportation time, break down time and weights of jobs (English)
    0 references
    0 references
    21 November 2005
    0 references
    Summary: This paper provides a new simple heuristic algorithm for a `3-Machine, \(n\)-job' flow-shop scheduling problem in which jobs are attached with weights to indicate their relative importance and the transportation time and break down intervals of machine are given. A heuristic approach method to find an optimal or near optimal sequence minimizing the total weighted mean production flow time for the problem has been discussed.
    0 references

    Identifiers