Solving realistic industrial scheduling problems using a multi-objective improved hybrid particle swarm optimisation algorithm (Q2627583)
From MaRDI portal
scientific article
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Solving realistic industrial scheduling problems using a multi-objective improved hybrid particle swarm optimisation algorithm |
scientific article |
Statements
Solving realistic industrial scheduling problems using a multi-objective improved hybrid particle swarm optimisation algorithm (English)
0 references
31 May 2017
0 references
Summary: In this paper, the real-world multistage hybrid flow shop scheduling problem (HFSSP) is contemplated. The HFSSP is strongly an NP-hard (non-deterministic polynomial time hard) problem. Due to their theoretical and practical significance, several researchers have tackled the HFSSPs with a single objective function (makespan). However, many industrial scheduling problems involve multiple conflicting objectives and hence such problems are more complex to solve. But, multi-objective optimisation algorithms are relatively scarce in the HFSSP literature. This paper proposes a hybrid algorithm based on particle swarm optimisation (PSO) for the multi-objective HFSSPs. The proposed multi-objective improved hybrid particle swarm optimisation (MOIHPSO) algorithm searches the Pareto optimal solution for makespan and total flow time objectives. In the proposed MOIHPSO algorithm, two different sub-populations for the two objectives are generated and different dispatching rules are used to improve the solution quality. Moreover, the mutation operator is incorporated in this MOIHPSO to avoid the solution to be trapped in local optima. Data from a steel furniture manufacturing company is used to illustrate the proposed methodology. Simulation results demonstrate the effectiveness of the proposed algorithm.
0 references
flow shop scheduling
0 references
hybrid flow shops
0 references
HFS
0 references
NP-hard
0 references
particle swarm optimisation
0 references
PSO
0 references
multi-objective optimisation
0 references
makespan
0 references
total flow time
0 references
mutation
0 references
steel furniture
0 references
furniture manufacturing
0 references
simulation
0 references