GA, SA and RB/KB-based hybrid method in FMS scheduling (Q2704885)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: GA, SA and RB/KB-based hybrid method in FMS scheduling |
scientific article
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | GA, SA and RB/KB-based hybrid method in FMS scheduling |
scientific article |
Statements
4 July 2001
0 references
flexible manufacturing system scheduling
0 references
genetic algorithms
0 references
simulated annealing
0 references
heuristics
0 references
GA, SA and RB/KB-based hybrid method in FMS scheduling (English)
0 references
0.8569367
0 references
0.84931207
0 references
0.84100956
0 references
0.8369943
0 references
0.8283343
0 references
0.8268881
0 references
0.82619274
0 references